TRANSIENT STABILITY ANALYSIS OF POWER SYSTEM USING MATLAB
ABSTRACT
This paper presents
transient stability assessment of multi-machine system with the help of
Simulink based model. Transient stability of power system is based on the
generator relative rotor angles obtained from time domain simulation outputs. A
self-sufficient model of IEEE nine bus system has been given with full detail
and transient stability analysis is done by considering three phase fault at a
bus with different fault clearing time (FTC) and the results are found to be
more accurate and quiet satisfactory as compared to models simulated in PSPICE
and other electromagnetic transient program.
Keywords:- MATLAB,
Simulink, FCT, transient stability.
INTRODUCTION
Modern electric power systems have grown to a large complexity
due to interconnections, installation of large generating units and extra high
voltage tie-lines etc. Due to increased operations which may cause power system
to be highly stressed condition, the need for dynamic stability of power system
is arising. Transient stability assessment (TSA) is part of dynamic security
assessment of power system which evolves the evolution of the ability of power
system to remain in equilibrium when subjected to disturbances. The system
response to such disturbances involves large variation of rotor angles, power
flows bus voltages and other system variables. Transient stability is a condition
that characterizes the dynamics of power system subjected to a fault, the initial
state preceding the fault is balanced one. A system is said to possess transient
stability if after the fault it is capable of maintaining synchronous operation
and returning to initial state or close to it. The transient stability is a
function of both operating condition and the disturbance. This makes the transient
stability analysis complicated as the nonlinear ties of the system cannot be
ignored. In stability assessment the critical clearing time (CCT) is a very
important parameter in order maintain the stability of power system. The CCT is
maximum time duration that a fault may occur in power system without loss of
stability. Fault clearing time is set randomly. If the fault clearing time
(FCT) is more than CCT then the relative rotor angles will go out of step and the
system will lose stability. Methods normally employed to find out the TSA are by
using time domain simulations, direct and artificial intelligence methods. Time
domain simulation method is implemented by solving the state space differential
methods. Simulink is an interactive environment for modeling and simulating a
wide variety of dynamic systems. A system is built easily using blocks and
results can be displayed quickly. Simulink is used for studying the effects of non-linearity
of the system and thus is an ideal research tool. Use of Simulink is growing
rapidly for research work in the area of power system and also in the other
areas. In this paper multi machine nine bus system is modeled in
Matlab/simulink and transient stability analysis is done with the fault located
in a bus.
SYSTEM MODELING
The system used is IEEE 9 bus system with three generators,
six transmission lines, three load buses and three transformers is shown in Fig
1. The base MVA is 100 and the system frequency is 60 Hz. The system data is
given in Appendix 1.The fault is occurring near bus 7 and fault is cleared by
opening line 5-7.Fault clearing time is set randomly. The complete system is
modeled in Simulink with the mathematical equations. All the buses except the machine
buses are eliminated and multi-port representations of the internal nodes of
the generators are obtained. Using the self and transfer admittance parameters
of reduced electrical network electric power output of the generators can be
obtained. The program to obtain the reduced admittance matrix is given in
Appendix. The admittance matrix Ybus,mod is augmented by including the
transient reactance of the generators. Let Ybus,mod after inclusion of load
impedances be partitioned as
Where sub matrix Y1 is of order m×m and corresponds to
the buses where generators are connected and Y2 , Y3 and Y4 are the other sub matrices.
Then the augmented bus admittance matrix Ybus,aug with ground as reference
would be represented as
The matrix is reduced by applying Kron’s reduction formula
eliminating all buses expect the generator buses. For symmetrical three phase
to ground at bus k the row and column corresponding to bus k are set to zero
before applying network reduction. In stability analysis three reduced matrices
are required to be computed pre-fault, during fault and the post fault in power
system.
Fig. 1 WSCC 3-machine 9 bus system
The generator electric power output for each machine is
computed by following equation
Where
The equation of the motion are given by
And
It is noted that prior to the fault (t=0) Pmi0 = Pei0 The
subscript 0 is used to indicate the pre transient conditions.
As the network changes due to fault, the corresponding
values will be changed in the above equation.
SIMULINK MODELS
The complete three generator system shown in Fig.1 has
been simulated as single integral model in Simulink. Fig 2 shows the complete
block diagram of the system for transient stability study. Subsystems 1 is
meant to compute the electric power output of each generator. The model also
facilitates the choice of simulation parameters like start time, stop time, solver
etc.
Fig.2 Complete system Model for Transient
stability Analysis
Fig.3 Simulink model for Computation of
electric power output of generator 1
SIMULATION RESULTS
System Responses are given for different values of FCT.
Fault is created near bus 7 and it is cleared at different clearing time by
opening line 5-7. Fig 4 (a) and (b) shows the relative angular positions of the
generators taking generator one as reference and individuals angles of each
generator. Fig(c) and (d) shows the accerlating powers and angular velocities of
each generator for the FCT equal to 0.1sec Fig shows that the rotors angles are
in synchronism with each other making the system stable when the fault clearing
time is 0.1sec.As the FCT increases the system will move towards instability as
the FCT will become greater that the CCT. When the FCT in 0.3 sec. the system
is unstable. Fig 5(a)-(d) shows the accerlating powers, Relative angular
positions and angular velocities of the generators and Fig 5(b) shows as the
fault clearing time is increased the rotor angles of the generators go out of
synchronism and the system is losing stability.
(Fault cleared at 0.1s)
(a) Relative angular positions of angles
(Fault cleared at 0.1s)
(b) Angular positions of individual
generators
(Fault cleared at
0.1s)
(c) Generator accelerating Powers
(Fault cleared at 0.1s)
(d) Angular velocities of generators
Fig 4 (a) – (d)
(Fault cleared at 0.3sec)
(a) Accerlating power of generators
(Fault cleared at 0.3sec)
(b) Relative angular positions of generators
(Fault cleared at 0.3 sec)
(c) Angular velocities of individual
generators
Fig 5(a)-(c)
Fig 6(a)-(b) shows the relative rotor angles and the accelerating
powers of the generators. Fig 6(a) shows that the rotor angles synchronism
making the system unstable.
(Fault cleared at 0.5sec)
(a) Relative angles in degree
(Fault cleared at 0.5sec)
(c) Accerlating powers of the generators
Fig.6 (a) - (b)
CONCLUSION
A complete model to study the transient behavior of Multi-machine
system was developed using Simulink. It is basically a transfer function and
block diagram representation of system equations. The system was simulated for
different FCT and the results are highly satisfactory. A Simulink model is very
user friendly and for transient stability analysis the model facilitates the
fast and precise solution of nonlinear differential equation.
REFERENCES
[1] P.Kundur, Power system Stability and control, EPRI
Power Sytem Engineering Series.
[2] I.J.Nagrath and D.P.Kothari, Power system Engineering
[3] Louis-A Dessaint et al., ‘Powe system simulation tool
based on Simulink, IEEE Trans. Industrial Electronica 1999, 1252- 1254
[4] P.M Anderson and A.A.Fouad, Power System Control and
stability 1977
[5] M.Klein ,G.J.Rogers,P Kundur,”A fundamental Study of
Inter –Area Oscillation in Power Systems,”IEEETranssactions on Power System.vol
6, No 3,August 1991
[6] L.Wang ,F Howell ,P.Kundur, C.Y.Ching and w.Xu, “a
tool for small Signal assessment of Power Systems,” PICA 2110, Sydney,
Australia, May 21-24,2001
[7] M.J.Gibbard,N. Martin, J.J Sanchez-Gasca, N.Uchida,V
Vittal and L.Wang, “Recent Applications of Linear Analysis Techniques,” IEEE
Trans. On Power Systems, Vol 16,No 1 February 2002
[8] M.Randhawa,B.Sapkota, V. Vitt al,S.Kolluri and
S.Mondal,”Voltage stability assessment for Large Power Systems,”proc. 2008 IEEE
Power and Energy Society General Meeting.
No comments:
Post a Comment